Contact

Aquapark in Moscow

The total area of the complex is 4200 m2.

Manifold cabinets are hidden in niches, as well as in the areas of decorative rocks. Because of the small temperature difference between the floor surface and the room temperature in the pool, underfloor heating system can't play the role of the main heating system. The main heating load is carried by ventilation. This solution is a standard for water parks, spa centers and swimming pools.